Preparations for testing

The Kockum Sonics Horns were lifted on to the Svitzer Redbridge tug and air systems installed in preparation of the testing

 

KcVxSc2peyI-3fu6GhRL-9erSmISHAeAf1uBi2_MjTg.jpeg
Posted on June 7, 2013 .